Tour lumineuse
Description
The mobile light towers feature excellent wind resistance and a wide area of illumination. They can be utilized in variety of situations,such as construction sites, disaster recovery, industry, mining and event lighting.
The mobile light towers are available with 1000w,4000w,8000w lights, designed for a compact and efficient installation. Both the telescoping mast and illumination angle of the lights can be easily adjusted giving the operator great flexibility in lighting the area.
Easy for transport
The light tower is with wheels or drawbar. LTG2500, LTG5500, LTD6700 with four 10inch pneumatic tyres, easy to move. LTD12000 with two big tyres and drawbar, it can be hanged in your car or truck.
Many kinds of lamps
PME supply LED lamp, metal halide lamp, floodlight, spotlight and balloon light as optional.
Safe operation
The brake and stand bar to keep the light tower steady on all surface. After starting the generator, the pneumatic pump can lift the pneumatic-spring lifting mast automatically, and keep its steady. For the mechanical lifting mast, there is brake system to keep the mast steady.
Wide lighting area
The remote control and platform structure can change the lamps to all direction easily. Do not need to adjust the lamps by handle.
Each lamp can be individually adjusted without tools. The tower is designed to be user friendly in term of both operation and handling.
Back-up power
Generator powering the light tower can be used a backup power in emergency situations. There are two receptacles on the light tower mast. You can switch off the light and then connect another electrical load to get a quality output from the generator.
Technical Parameters
Model | LTG2500 | LTG5500 | LTD6700 | LTD12000 |
---|---|---|---|---|
Rated frequency [Hz] | 50/60 | 50/60 | 50/60 | 50/60 |
Rated power [kw] | 2.0kw (50Hz); 2.2kw (60Hz) | 5.0kw (50Hz); 5.5kw (60Hz) | 4.6kw (50Hz); 5.0kw (60Hz) | 8.5kw (50Hz); 10.5kw (60Hz) |
Max.power [kw] | 2.2kw (50Hz); 2.4kw (60Hz) | 5.5kw (50Hz); 6.0kw (60Hz) | 5.0kw (50Hz); 5.5kw (60Hz) | 9.5kw (50Hz); 11.5kw (60Hz) |
Rated voltage [v] | 220; 230; 240 (depend on requirement) | 220; 230; 240 (depend on requirement) | 220; 230; 240 (depend on requirement) | 220; 230; 240 (depend on requirement) |
Power factor | 1 | 1 | 1 | 1 |
Phase | Single phase | Single phase | Single phase | Single phase |
Fuel | Petrol | Petrol | Diesel | Diesel |
Fuel tanks capacity [L] | 15 | 25 | 14.5 | 70 |
Durée de fonctionnement continu [h] | 12.5 | 9 | 6.5 | 17.5 |
Generator N.W.[kg] | 39 | 84 | 153 | 650 |
Total power of the lamp [w] | 500x2 | 1000x4 | 1000x4 | 2000X4 |
Luminous flux [lm] | 144000 | 440000 | 440000 | 880000 |
Mast | 3 stages lifting mast | 3 stages lifting mast | 3 stages lifting mast | 3 stages lifting mast |
Lifting limit of the mast [m] | 3.5 | 4.2 | 4.2 | 5 |
Inclination | ≤10 degrees | ≤10 degrees | ≤10 degrees | ≤10 degrees |
Windproof ability | ≤8 grade | ≤8 grade | ≤8 grade | ≤8 grade |
Light Tower N.W. [kg] | 140 | 310 | 380 | 850 |
Application
Maintenance
Engine periodic maintenance schedule
Chaque utilisation | 1er mois ou 20 heures | Tous les 3 mois ou 100 heures. | Tous les 6 mois ou 500 heures. | Chaque année ou 1000 heures. | |
---|---|---|---|---|---|
Vérifier et remplir le réservoir de carburant | √ | ||||
Déchargement du combustible | √ | ||||
Vérifier et remplir l'huile | √ | ||||
Vérifier les fuites d'huile | √ | ||||
Contrôler et serrer les ferrures extérieures | √ | ||||
Vidange d'huile | √ | √ | |||
Changement du filtre à huile | √ | ||||
Remplacer l'élément du filtre à air | √(1) | ||||
Nettoyer le filtre à carburant | √(2)(changement) | ||||
Vérifier la pompe à huile haute pression | √(2) | ||||
Vérifier la buse | √(2) | ||||
Vérifier le tuyau de carburant | √(2) | ||||
Ajuster les ouvertures de l'entrée d'air et de la porte d'évacuation | √(2) | √(2) | |||
Entrée d'air de broyage et grille d'évacuation d'air | √(2) | ||||
Remplacer le segment de piston | √(2) | ||||
Vérifier la solution électrolytique de l'accumulateur | Chaque mois | ||||
Vérifier le balai électrique et la bague de glissement | √(2) | ||||
Vérifier la résistance de l'isolation | L'arrêt de travail est supérieur à 10 jours |
Effectué tous les mois indiqués ou toutes les heures de fonctionnement, au premier des deux termes échus.
(1) Entretien plus fréquent en cas d'utilisation dans des zones poussiéreuses.
(2)L'entretien de ces éléments doit être confié à votre revendeur, à moins que vous ne disposiez des outils adéquats et que vous soyez mécanicien. Reportez-vous au manuel pour connaître les procédures d'entretien.